Project Description

Stripping lift and removal by cranage

CBES stripped the old lift and removed by the old lift by cranage.

To enable the lift installation CBES fitted new steelwork lift brackets to the entire left-hand side of shaft, widen the entrances and then made good to 3 floor entrances.

Due to the location of the building within the airport there were added challenges of organising restricted pass access and out of hours working.